Operating times:
H24
Customs & Immigration:
H24
Runways
1 RWY, 3200m/10498ft 1 Runway, longest: 3200m/10498ft (paved)
Source: OpenAIP
09/27
Asphalt
Length
3200m
10498ft
10498ft
09/27
Asphalt
Length
3200m/10498ft
3200m/10498ft
Strength
721/F/A/X/T
PCN
AVGAS
Jet A1
AVGAS, Jet A1: Truck · H24
| Type | Community price |
|---|---|
|
|
€2.50 / L |
Last reported 2026-05-15 · Refreshed 2026-05-27 · Community data can be inaccurate or outdated: Update Prices.
Airport Webcams
Loading webcams...
↓ 7 kt
→L 2 kt
Wind
250° · 7 kt
Temperature
22°C
Dew point
15°C
Visibility
CAVOK
QNH
1018 hPa
Ceiling
Clear
2-Hour Trend
No significant change expected
METAR: 23 mins · aviationweather.gov
| Rwy | Cross | Head |
|---|---|---|
| 27 | →L 2 kt | 7 kt ↑ |
| 09 | ←R 2 kt | 7 kt ↓ |
Tomorrow 13:00Z → Tue 00:00Z
VFR
[BECMG 28012KT 9999 NSW NSC]
Becoming (BECMG)
280° 12 kt · 9.7 km · No Significant Weather (NSW) · No significant clouds (NSC)
18:00Z → Tomorrow 13:00Z
VFR
[20008KT 9999 NSW NSC]
200° 8 kt · 9.7 km · No Significant Weather (NSW) · No significant clouds (NSC)
METAR GMAD 252030Z 25007KT CAVOK 22/15 Q1018 NOSIG TAF GMAD 251700Z 2518/2624 20008KT CAVOK BECMG 2613/2615 28012KT
Useful Links
* = login required
Pilot Comments for GMAD
No pilot comments yet
Be the first to share your experience at GMAD
AirfieldBot
Handling is mandatory. Example: total handling, landing, and parking about €320, payable by MasterCard. Fuel is available and must be paid in cash, either in EUR or MAD; when paying in MAD, a currency exchange or ATM receipt is required. Only up to 2,000 MAD may be taken out of the airport. Change is often treated as a tip, so small notes are useful. IFR operations are handled professionally. Notify the airport at least 24 hours before arrival; do not rely solely on Eurocontrol for flight plan transmission—sending a fax is recommended. Filing the flight plan on a paper form is standard. The C-office is located in the tower building and managed by controllers. Wearing a pilot shirt with epaulets can simplify airside access; have a Gendec ready for officers.
Ground procedures can involve multiple uniformed officials and repeated document checks; expect to show passports and destination details several times. For technical stops or refueling only, indicate this in the flight plan to reduce entry formalities and fees. Efficient processing is possible when not busy, but administrative steps may cause delays.
Fuel payment requires cash; fuel price examples are not included here per instructions. Taxi to Agadir city center takes 30–45 minutes. Only up to two contacts may be listed, but none are provided in the reports.
Overall, GMAD supports non-commercial GA operations with mandatory handling and professional IFR service, but administrative procedures can be time-consuming and require preparation with documents and cash for payments.